The Chapel of Christ the King (a.k.a. the Lutheran Campus Chapel) received a face lift.  For the past two weeks Joseph Oliverio Painting has been hard at work.  The outside of the building is completed, following a pressure washing and sealing of the brickwork and a comprehensive painting of all the woodwork.  Now, the interior draws close to completion.  Here are some photos.
 
Mist shrouds chapel as crew pressure washes Hough Street wall.
Caulking and minor repairs are part of the prep work.  Thanks to the painters, the chapel's porch roof was repaired.  Chaplain Riegel now knows better than to ever walk on the roof again when hanging banners.
Spraying new paint over primer coat.
Cherry picker comes in handy.

More pictures coming, and, if you are on the campus, stop by and take a look.